Skip to main content

The Cross River Rail project consist of a new 10.2 kilometre rail line running from Dutton Park to Bowen Hills, which includes a 5.9 kilometre twin tunnel under the Brisbane River and CBD. It will deliver four new underground stations at Boggo Road, Woolloongabba, Albert Street and Roma Street, and upgrades to Dutton Park and Exhibition stations. The $5.4 billion project will unlock the bottle neck at the core of Brisbane’s transport network allowing more trains to run more often. Cross River Rail willbe operational in 2024. GM Rail has been engaged to provide project engineering support throughout the railway construction